New 765-kV power lines could serve 2M homes near Columbus

robot
Abstract generation in progress

FirstEnergy Transmission and Transource Energy have received approval from the PJM Board to jointly develop a major electric transmission project in central Ohio. This project will include over 300 miles of new 765-kV lines and substation upgrades, aiming to enhance reliability, support growing demand in the Columbus region, and attract new industry. The collaboration, through Grid Growth Ventures LLC, is designed to reduce land use and deliver cost-effective solutions for the region’s increasing power needs.

This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
0/400
No comments
  • Pin

Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
English
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский язык
  • Français
  • Deutsch
  • Português (Portugal)
  • ภาษาไทย
  • Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)